Pavement Inspection Report of Longyong Project in Hunan Province


Release time:

2021-07-09

TJ27 Contract Section of Longshan-Yongshun Expressway in Hunan Province

LK 14 000-LK 15 000 Section Pavement Engineering Quality Inspection Report

Overview of 1. works

The TJ27 contract section of Longyong Expressway is a car wash river connection line with starting and ending pile numbers of LK 12 000 ~ LK 19 380.374, with a total length of 7.611km. Among them, LK 14 000-LK 15 000 1km road section adopts the new road construction technology of "bio-enzyme soil solidified subbase, base and multi-element multiple modified roller compacted concrete surface layer"; The pavement structure is designed as 8cm multi-element multiple modified roller compacted cement concrete upper layer 10cm multi-element multiple modified roller compacted cement concrete lower layer 1cm modified permeable seal layer 20cm bio-enzyme soil solidified base layer 18cm bio-enzyme soil solidified base layer 10cm gravel cushion layer.

 

2. inspection basis

Standard for Quality Inspection and Evaluation of Highway Engineering (JTG F80/1-2001);

Specification for Field Testing of Highway Subgrade and Pavement (JTG E60-2008);

Test Code for Cement and Cement Concrete of Highway Engineering (JTG E30-2005);

Technical Code for Construction of Highway Cement Concrete Pavement (JTG F30-2003);

Design of Pavement Change of LK 14 000-LK 15 000 for Car Washing River Connection Line of Contract Section 27 of Longshan-Yongshun Expressway in Hunan Province (Hunan Provincial Transportation Planning, Survey and Design Institute).